Direct costs and overhead Job 87M had direct material costs of $400 and a total cost of $2100. Overhead is allocated at the rate of 75 per cent of pr
Direct costs and overhead
Job 87M had direct material costs of $400 and a total cost of $2100. Overhead is allocated at the rate of 75 per cent of prime cost (direct material and direct labour).
Required
(a) How much direct labour was used?
(b) How much overhead was allocated?